Regulatory guide: the process for obtaining renewable power

A general framework for how open access and renewable procurement work in India. Rules vary by state: treat this as an orientation, not a substitute for state-specific advice.

Step by step

The general process

1

Confirm eligibility

Check your connected/contracted load against your state's open access threshold (100 kW minimum, per the 2022 rules).

2

Choose your structure

Decide between a captive, group captive, or third-party open access model: each has different ownership and regulatory implications.

3

Apply for connectivity

Submit a formal application to your DISCOM / state transmission utility for grid connectivity and open access approval.

4

Secure regulatory approval

Your SERC reviews and approves the open access application, including wheeling and banking terms.

5

Execute agreements

Sign the PPA with your generator and the wheeling/connection agreements with the relevant DISCOM(s).

6

Commissioning & metering

Once the generator commissions the plant, net/gross metering is installed and billing begins flowing through the agreed structure.

Charges you're likely to encounter

What each charge means

ChargeWhat it is
Wheeling chargesFee for using the grid to transport power from the generator to your site, set by the state.
Cross-subsidy surcharge (CSS) (for non-captive plants)A charge that compensates the DISCOM for the subsidy it would otherwise have collected from you as a captive tariff customer.
Additional surcharge (for non-captive plants)Charged in some states to cover the DISCOM's stranded fixed costs when a large consumer moves to open access.
Transmission & distribution lossesA small percentage of energy lost in transit, typically deducted from the units you’re billed for.
Banking chargesWhere applicable, a fee (sometimes in-kind, as a percentage of banked units) for the ability to export excess solar and draw it back later.